This is TikiWiki v1.9.8.3 -Sirius- © 2002–2007 by the Tiki community Mon 30 of Dec, 2024 [18:22 UTC]
Menu

Category D.2.9 Management

Copyrights Cost estimation Life cycle Productivity Programming teams Software configuration management Software process models (e.g., CMM, ISO, PSP) Software quality assurance (SQA) Time estimation
Browse in:
All Wiki pages Image galleries Images File galleries Blogs Trackers Items Surveys Articles

search category: deep:

Hide subcategories objects

..
 

Objects (9)

D.2.9 Management Article A SMALL SETTINGS CASE STUDY USING TSPI ... Abstract: This article introduces a small setting case study about the benefits of using TSPi in a software project. An adapted process from the current process based on the TSPi was defined. The pil 
D.2.9 Management Article DEPENDENCE OF INFORMATION AND TELECOMMUNICATION TECHNOLOGY DEVELOPMENT ... Abstract: The article describes an analysis of the relationships between different ICT services indicators and economic indicators. Article also gives view for determining the impact of the economic  
D.2.9 Management Article HUMAN AND TELECOMMUNICATION TECHNOLOGIES LIFE CYCLES COMPARISON Annotation: Main stages of human life cycle are described. The human and telecommunication technologies life cycle’s comparison is done. The general approach to the consideration of telecommunicati 
D.2.9 Management Article OUTSOURCING CONTRACTS: A SYSTEMATIC REVIEW Abstract: This paper presents the application of a systematic review protocol for Software Engineering. This protocol is used as a formal model by applying systematic review of outsourcing contracts. 
D.2.9 Management Article OUTSOURCING CONTRACTS: A SYSTEMATIC REVIEW Abstract: This paper presents the application of a systematic review protocol for Software Engineering. This protocol is used as a formal model by applying systematic review of outsourcing contracts. 
D.2.9 Management Article QUALITY AND PRODUCTIVITY ANALYSIS IN A VERY SMALL ENTERPRISE USING TSPI Abstract: This article shows the benefits of developing a software project using TSPi in a “Very Small Enterprise” based in quality and productivity measures. An adapted process from the current  
D.2.9 Management Article QUALITY AND PRODUCTIVITY ANALYSIS IN A VERY SMALL ENTERPRISE USING TSPI Abstract: This article shows the benefits of developing a software project using TSPi in a “Very Small Enterprise” based in quality and productivity measures. An adapted process from the current  
D.2.9 Management Article REQUIREMENTS MANAGEMENT AND ACQUISITION MANAGEMENT ... Abstract: As a part of the activities of the first Symposium on Process Improvement Models and Software Quality of the Spanish Public Administration, working groups were formed to discuss the current 
D.2.9 Management Article SOFTWARE MODEL COGNITIVE VALUE Abstract: An approach for estimation of Software Models (SMs) from Cognitive Science point of view is outlined in the paper. The basic notion of this approach is the new term “Software Model Cognit 

Page: 1/1
1  
World Clock
Powered by Tikiwiki Powered by PHP Powered by Smarty Powered by ADOdb Made with CSS Powered by RDF powered by The PHP Layers Menu System
RSS Wiki RSS Blogs rss Articles RSS Image Galleries RSS File Galleries RSS Forums RSS Maps rss Calendars
[ Execution time: 0.20 secs ]   [ Memory usage: 9.09MB ]   [ GZIP Disabled ]   [ Server load: 0.23 ]